SAP Capacity Planning (PP-CRP)

Capacity Planning (PP-CRP) is an article provided by SAP AG. This SAP PP article is intended for SAP System Administrators, Production Planning (PP) developer and SAP technology Consultants.
This SAP Production Planning and Control (PP) article explains you about Capacity Planning component in SAP R/3 System for long term rough cut planning, medium term planning and short term detailed planning for economic use of resources to meet company's objectives. With the help of this article you will learn Capacity planning integration with SAP SD, SAP PP SOP, SAP PP MRP, SAP PP LTP, SAP PP SFC, SAP PP REM, SAP PP PI, SAP PM, SAP SM and SAP PS along with various features of this component such as capacity evaluation, capacity leveling, and capacity planning.
Following are the few topics covered in this SAP PP CRP document.
  • Calling up the Area Menu for Capacity Planning
  • Capacity Planning (PP-CRP)
  • Available Capacity
  • Capacity Requirements
  • Distribution of Capacity Requirements
  • Continuous and Discrete Distribution
  • Distribution of Remaining Capacity Requirements
  • Cumulation of Available Capacities and Capacity Requirements
  • Static Cumulation
  • Period Pattern Key
  • Dynamic Cumulation
  • Cumulation of Available Capacities
  • Reduction of Capacity Requirements
  • Scheduling
  • Elements of Scheduling
  • Scheduling Elements for Networks, Plant Maintenance Orders and Process Orders
  • Elements of Scheduling for Planned Orders and Production Orders
  • Duration of Operations
  • Operating Time
  • How Scheduling is Carried Out
  • Scheduling and Capacity Requirements Calculation
  • Parameters for Scheduling and Calculating Capacity Requirements
  • Scheduling Levels
  • Parameters for Detailed Scheduling
  • Reduction
  • Scheduling Partially-Confirmed Operations
  • Scheduling Log