SAP Capacity Planning in MPS and MRP

Capacity Planning in MPS and MRP is an article provided by SAP AG. This SAP PP article is intended for SAP System Administrators, Production Planning (PP) developer and SAP technology Consultants.
This SAP Production Planning (PP) document explains you about Capacity planning in MPS and MRP, Capacity leveling in MPS and MRP, executing capacity planning (MPS/MRP) and more. With the help of this SAP PP article you will learn to plan carefully using MPS, scheduling in MRP and MPS, and planned order processing, etc.
Following are the few topics covered in this SAP PP capacity planning guide.
  • Capacity Leveling in MPS and MRP
  • Determining Basic Dates
  • Lead Time Scheduling
  • Carrying out Capacity Planning (MPS/MRP)
  • Capacity Leveling or Capacity Situation
  • Executing Single-Item Planning
  • Executing Interactive Single-item Planning
  • Planned Order Processing
  • Current Stock/Requirements List
  • Calling up Capacity Leveling
  • Executing Capacity Leveling from the Material View
  • Executing Capacity Leveling from the Order View
  • Functions in Capacity Leveling
  • Selecting Capacities
  • Executing the Overload Check
  • Displaying the Maximum Load and Selection of the Overload Periods
  • Displaying the Scheduling Data
  • Displaying Pegged Requirements in Detail
  • Displaying all the Planned Orders for a Material
  • Displaying Capacity Planning in the Material View
  • Capacity Planning in the Order View
  • Calling up the Capacity Situation
  • Functions in the Capacity Situation
  • The Capacity Check
  • Executing the Capacity Check
  • Capacity Planning Table
  • Branching to the Capacity Planning Table
Read More/Try It
Related SAP PP Material