SAP Capacity Evaluation (PP-CRP-ALY)

Capacity Evaluation (PP-CRP-ALY) is an article provided by SAP AG. This SAP PP article is intended for SAP System Administrators, Production Planning (PP) developer and SAP technology Consultants.
This SAP Production Planning (PP) article explains about Capacity Evaluation (PP-CRP-ALY) and its purpose such as to analyze capacity loads and can adjust analyses according to planning level, planning horizon and area of responsibility. With the help of this SAP PP article you will learn capacity evaluation and its features and constraints.
Following are the few topics covered in this SAP PP Capacity evaluation (PP-CRP-ALY) guide.
  • Capacity Evaluation (PP-CRP-ALY)
  • Standard Overview
  • Detailed Capacity List
  • Variable Overview
  • Specify and Change Settings
  • Overall Profile (Capacity Evaluation)
  • Selection Profile
  • Options Profile
  • List Profile
  • List Version of the Detailed Capacity List
  • List Version of the Variable Overview
  • Saving a List Version of the Detailed Capacity List
  • Graphics Profile
  • Calling Up the Capacity Evaluation
  • Selection of Data
  • Executing Detailed and Hierarchy Selection
  • Selection Screen
  • Calling Up the Selection Screen
  • Calling Up the Selection List
  • Set
  • Combination
  • Layout of the Data
  • Distribution of Capacity Requirements
  • Continuous and Discrete Distribution
  • Distribution of Remaining Capacity Requirements
  • Cumulation of Available Capacities and Capacity Requirements
  • Static Cumulation
  • Period Pattern Key
  • Dynamic Cumulation
  • Cumulation of Available Capacities
  • Display and Edit Objects
  • Calling up Capacity Leveling
  • Graphical Display
  • Printing
  • Exporting an Evaluation List as an EXCEL File
  • Shop Floor Information System
  • Calling Up the Shop Floor Information System
  • Input / Output Diagram
  • Calling Up the Input/Output Diagrams
  • Extended Evaluation
  • Specify and Change Settings (Extended Evaluation)
  • Overall Profile (Extended Evaluation)
  • Select fields (Extended Evaluation)
  • Calling up the Extended Evaluation
  • Display Actual Capacity Requirements
  • Displaying Objects (Extended Evaluation)
Read More/Try It
Related SAP PP Material